Preparing the Ground for a New Barn

This project involved extensive groundworks to create a large hardstanding, ready for the future construction of a new barn.

We carried out a basic cut and fill to open up and level the space before constructing the pad. All excavated material was bunded onsite to form a new hedgerow bank, reducing the need for removal and supporting local biodiversity.

Land drains were installed within the foundation to manage groundwater and surface runoff, and a new surface water ditch was cut along the boundary to further improve drainage.

Let’s Discuss Your ProjectBack to All Projects

Swipe on mobile or click and drag on desktop to explore the gallery

20241017_151608.jpg
IMG-20241018-WA0022.jpg
IMG-20241018-WA0018.jpg
IMG-20241018-WA0005.jpg
IMG-20241018-WA0002.jpg
IMG-20241011-WA0010.jpg
IMG-20241011-WA0009.jpg
20241019_094535.jpg
20241019_094502.jpg
20241017_152247.jpg
20241009_101209.jpg
20241017_151138.jpg
20241015_152339.jpg
20241015_152302.jpg
20241015_152229.jpg
20241015_152147.jpg
20241015_151312.jpg
20241009_113057.jpg
20241009_101323.jpg
...
20241017_151608.jpg
IMG-20241018-WA0022.jpg
IMG-20241018-WA0018.jpg
IMG-20241018-WA0005.jpg
IMG-20241018-WA0002.jpg
IMG-20241011-WA0010.jpg
IMG-20241011-WA0009.jpg
20241019_094535.jpg
20241019_094502.jpg
20241017_152247.jpg
20241009_101209.jpg
20241017_151138.jpg
20241015_152339.jpg
20241015_152302.jpg
20241015_152229.jpg
20241015_152147.jpg
20241015_151312.jpg
20241009_113057.jpg
20241009_101323.jpg

Loading... Updating page...